This task has no checklists yet
One ITP makes one checklist. Several ITPs make several checklists, all sent to the App for the site user to pick from.
One ITP makes one checklist. Several ITPs make several checklists, all sent to the App for the site user to pick from.
| Seq No. | Inspection Point | Activity | Acceptance Criteria | Records Required |
|---|
This checklist is being generated, which can take a few minutes. Nothing to do here — it fills in by itself and the list updates when it is ready.
Upload one if there is none; otherwise tick the files you have. Each ITP you tick becomes one checklist.
Who this capture stands for; it goes on every checklist of this run.
Represent is required
Each ITP you keep produces a checklist of its own; several produce several, sent to the App for the site user.
—
Only this checklist changes
Only this checklist is rewritten
—
—
Select one or multiple technical documents for checklist generation
Name | Type | Size | Create Time | Action |
|---|
CNC1-HS-PXREQ-65-0000-0002_A (MR).pdf | Technical Documents | 8746014 | 2026-08-18 |
Version | Requested On | Requested By | ITP Records | Status | Action |
|---|
12 | 2026-09-16 14:32 | Lin Wei | 24 | Completed | |
11 | 2026-09-12 09:15 | Lin Wei | 18 | Completed | |
10 | 2026-09-05 16:48 | Chen Hao | 12 | Completed | |
9 | 2026-08-28 11:03 | Chen Hao | 6 | Completed | |
8 | 2026-08-20 17:26 | Lin Wei | 4 | Superseded | |
7 | 2026-08-14 10:12 | Zhang Min | 20 | Completed | |
6 | 2026-08-07 15:39 | Lin Wei | 16 | Completed | |
5 | 2026-07-30 09:44 | Chen Hao | 9 | Superseded | |
4 | 2026-07-22 13:57 | Zhang Min | 7 | Completed | |
3 | 2026-07-15 16:21 | Lin Wei | 3 | Superseded | |
2 | 2026-07-08 08:52 | Chen Hao | 2 | Superseded | |
1 | 2026-07-01 14:05 | Lin Wei | 1 | Superseded |
Version | Requested On | Requested By | Checklist Items | Status | Action |
|---|
8 | 2026-09-16 14:41 | Lin Wei | 32 | Completed | |
7 | 2026-09-09 10:27 | Lin Wei | 28 | Completed | |
6 | 2026-09-02 15:12 | Chen Hao | 19 | Completed | |
5 | 2026-08-25 11:35 | Lin Wei | 14 | Superseded | |
4 | 2026-08-18 09:58 | Zhang Min | 11 | Completed | |
3 | 2026-08-11 16:03 | Chen Hao | 8 | Superseded | |
2 | 2026-08-04 13:40 | Lin Wei | 5 | Superseded | |
1 | 2026-07-28 10:16 | Zhang Min | 3 | Superseded |
Upload this Visit's Work Scope and it goes straight to one checklist, sent to the App for the site user.
| Seq No. | Inspection Point | Activity | Acceptance Criteria | Records Required |
|---|
This checklist is being generated, which can take a few minutes. Nothing to do here — it fills in by itself and the list updates when it is ready.
—
Only this checklist changes
Only this checklist is rewritten
—
—
ITP ID | Material/Product | Tag/Item No. |
|---|
CNC1-HS-PPPLN65-SC02-0033-01 | 压力容器及换热器 | 适用于请购文件所列设备,具体以批准数据表、工程图及设备位号为准 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CNC1-HS-PPPLN65-SC02-0033-02 | 压力容器及换热器 | 适用于请购文件所列设备,具体以批准数据表、工程图及设备位号为准 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Assignment No. | A-2025-00125 |
| Client | XYZ Oil & Gas |
| Project | ABC Refinery Expansion |
| Vendor | Shanghai Valve Co., Ltd. |
| Sub-vendor | — |
| Product / Commodity | Ball Valve |
| Tag / Item No. | V-001 ~ V-020 |
| Quantity | 20 pcs |
| Manufacturing Location | Shanghai, China |
| Vendor PO No. | PO-4500789 |
| Contract No. | CON-2024-0156 |
| Inspection Stage | Manufacturing |
| Assignment Type | Third Party Inspection |
| Planned Start Date | 2025-03-10 |
| Target Completion | 2025-06-30 |
| Assigned Inspector | Michael Chen |
| Budget (Man-day) | 10 MD |
| Current Status | In Review |

| Client Contact | David Smith | |
| Vendor Contact | Li Wei | |
| Coordinator | Sarah Lee | |
| Inspector | Michael Chen |
Manufacturing inspection of 20 pcs Ball Valves including material verification, dimensional inspection, NDE review, hydrostatic and seat leakage testing, painting inspection, final inspection and documentation review, in accordance with approved ITP, project specification and client requirements.